PHASES & TIMELINE
Like a forest, a village grows through stages
GranjaLotes is developed in clear, sequential phases.
Early phases are coordinated by the GranjaLotes developer, while the long-term village structure is held by the Shared Ownership Association (SOA).
This phased approach keeps the project realistic, transparent and adaptable, while avoiding overbuilding or speculation.
Each phase builds on the previous one. Progress is based on readiness — not on artificial deadlines.
Villages, like forests, begin with seeds — design, structure and capital that allow different layers of participation to emerge over time.
PHASE 0 —Structuring & Alignment
Objective: Validate land, align capital, and structure the system before acquisition.
Legal & Structural Setup
SOA (Shared Ownership Association) established
Governance and ownership architecture defined
Financial structure designed to protect long-term stability
Territorial Validation
Identification of suitable continuous land
Preliminary masterplan sketch
Initial zoning and hub positioning
Water and agricultural logic review
Rough core infrastructure cost estimate
The sketch and infrastructure estimate validate the territory before acquisition.
Alignment
Early capital secured
Lot purchase pledges aligned
Strategic contributors engaged
Core households identified
Founding community scale validated
This phase confirms that the project has both structural viability and real human commitment before land acquisition.
PHASE 1 — MASTERPLAN & LEGAL STRUCTURE
Trigger
Land secured under the SOA structure
Core legal framework established
Acquisition-aligned capital confirmed
Infrastructure budget envelope confirmed before lot allocation
Objective
Translate land ownership into a coherent, executable territorial structure.
Integrated Masterplan
Full-site masterplan finalized
Residential clusters positioned
Agricultural backbone structured
Plaza and Workshop hubs fixed
Water systems engineered
Circulation hierarchy defined
The territory is designed as one continuous system.
Spatial & Legal Alignment
Final lot layout defined
Shared land clearly designated
Building envelope principles confirmed
Governance structure aligned with spatial design
Structure and space are harmonized.
Infrastructure Definition
Core infrastructure scope finalized
Budget envelope refined
Execution sequencing defined
Structural completion criteria established
Expansion remains secondary to backbone completion.
PHASE 2 — Allocation & Infrastructure Backbone
Trigger
The masterplan is finalized
The lot layout is defined
Capital participants formally confirm alignment
Allocation rights activate
Objective
Activate ownership and begin execution of the territorial backbone under the ratified masterplan.
Lot Allocation
Priority selection process begins
Pledges convert into allocation rights
Lot ownership formalized under the SOA structure
Fragmentation now occurs — but within a locked territorial framework.
Infrastructure Execution
Earthworks and terrain shaping
Water retention and drainage systems
Primary access routes
Utility backbone corridors
Agricultural backbone preparation
Design becomes territory.
Governance Activation
Operational voting activates
Structural voting remains suspended until Phase 3
Development execution authority operational
Capital discipline mechanisms active
The system transitions from planning to implementation.
Kleine verbeteringen
“Masterplan is complete” → masterplan is finalized (professioneler Engels)
“Capital participants formally accept it” → confirm alignment (vloeiender)
bullets overal zelfde stijl gemaakt
locked territorial framework klinkt sterker dan alleen “locked framework”
PHASE 3 — FIRST USE, BUILDING & SHARED FACILITIES
Trigger
Core infrastructure is in place and lots are accessible
The project becomes a functioning place
Objective
Transition from a development platform into a functioning territory.
Build Window Opens
Core infrastructure operational
Lots physically buildable
Private construction permitted
Building guidelines active
Existing pledges must be executed within 3 months
This is the moment the territory becomes livable.
Operational Activation
Agricultural systems enter structured operation
Workshop Hub becomes minimally operational
Shared domains begin functional use
Operational circles may form
Amortization discipline activates
Execution shifts from development to management.
Governance Transition
Structural voting thresholds activate (80%)
Operational voting continues
Annual budget discipline applies
Development authority narrows
Operational oversight increases
The system moves from development coordination to distributed governance.
PHASE 4 — MATURATION & LONG-TERM DEVELOPMENT
Trigger
Core infrastructure completed
All development loans repaid or converted
Structural reserve minimum secured
Objective
Complete the transition from a development structure to permanent shared governance.
Governance Normalized
Development authority ends
Governance fully distributed
The system no longer depends on founders or capital weight
Resident governance becomes the stable operating structure.
Financial Structure Mature
Capital obligations cleared or converted
Structural reserve secured
Operating budget stabilized
Founder subordinated capital resolved according to the waterfall
Infrastructure shifts from build-phase funding to long-term maintenance.
Territorial Continuity Preserved
Shared land remains continuous
Agricultural backbone protected
Hubs fully operational
The spatial logic becomes permanent.